Cairns Tropical Enterprise Centre

This $50M project  at James Cook University will stand alongside Cairns Hospital’s new 32-bed surgical centre on Charles Street in North Cairns, as part of the Far North Queensland Health Innovation Precinct. The building will house a centre for clinical teaching, training and research in medicine, allied health and related disciplines – all aligned to the needs of the Cairns region and its health workforce.


Products & Application

Wraptite was chosen as the airtight weather protection layer for its self-adhesive properties and was installed over the plywood substrate that supports the cladding.  HC8 was then used as a void former over the Wraptite to ensure moisture forming behind the copper tiles will safely drain away.

Project: JCU CTEC (Cairns Tropical Enterprise Centre)

Location: Smithfield QLD
Product: Wraptite-SA & HC8
Architect: Wilson Architects
Installer: Sustainable Cladding
Builder: Besix Watpac

ConstructionMembrane_PP_WraptiteSA 200x200 Image

About ProctorPassive Wraptite SA

ProctorPassive Wraptite SA combines the best properties of a vapour permeable membrane and a self adhesive water and air barrier in one innovative self-adhering product.

ProctorGeo HC8 EnkaVent PDS

About ProctorGeo HC8, Enkavent (Hairy Chest)

ProctorGeo HC8 EnkaVent Drainage Spacer Mat is a three dimensional shaped mesh of polyamide monofilaments, tangled and fused together. ProctorGeo HC8 EnkaVent is used to provide permanent drainage and air movement pathway and permit the removal of moisture. ProctorGeo HC8 EnkaVent also offers significant sound reduction from rain impact noise.